Asan, Aguada bridges complete
<span style="font-size:9.0pt;line-height:115%;font-family: "Arial","sans-serif"">he Department of Public Works cut the ribbon on the completed Asan and Aguada Bridges Rehabilitation Project today.</span>
by Jolene Toves
Guam - The Department of Public Works cut the ribbon on the completed Asan and Aguada Bridges Rehabilitation Project today. The project strengthens the structural capacity of the bridges to meet the Guam legal live loads standards as well as support the design loads and special vehicles proposed by Department of Defense. The $1.1 million project was 100% funded by the Federal Highway Administration and was awarded to Maeda Pacific.
Guam - The Department of Public Works cut the ribbon on the completed Asan and Aguada Bridges Rehabilitation Project today. The project strengthens the structural capacity of the bridges to meet the Guam legal live loads standards as well as support the design loads and special vehicles proposed by Department of Defense. The $1.1 million project was 100% funded by the Federal Highway Administration and was awarded to Maeda Pacific.

By KUAM News