GPA load shedding during peak hours in several villages
The Guam Power Authority announces the following load shedding schedule for this evening during the "peak" hours of 7:00 p.m. through 9:00 p.m. as needed depending on demand for power.
Guam - The Guam Power Authority announces the following load shedding schedule for this evening during the "peak" hours of 7:00 p.m. through 9:00 p.m. as needed depending on demand for power:
1. Parts of Tumon from JFK to Marriott Resort and PIC;
2. Tumon by Route 1 on left side to Happy Landing Road to Duty Free;
3. Pagat by Carnation Ave. Adacao Road to Latte Heights;
4. Tamuning from right side of Route 14 crossing Farenholt to Duty Free, down
Farenholt, right side of former Camp Watkins Road to Jonestown;
5. Dededo – down Route 1, right side to Dededo Village and Kaiser areas;
6. Dededo – North on Route 1, left side to Batulo Street and Wusstig Road;
7. Macheche – Harmon Loop Road left side to Harmon Industrial Park, GPA Main Office, Tumon Village Apts to Jack Peters;
8. Macheche – Cost U Less down Route 16 right side to Route 16 right side toward
Jack Peters and North Liguan Terrace to Micronesia Mall;
9. Pagat – Route 15 to former Kinney's Café to Route 10 to Japanese School area
All customers are kindly asked to conserve power.

By KUAM News