Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged. Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr), Phase 1 Cliffside – Tamuning From Monday, 6/10/24 to Saturday, 6/15/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures. Route 14 Resurfacing from Route 1 to Route 14B – Tamuning From Monday, 6/10/24 to Saturday, 6/15/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14 (Chalan San Antonio) and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures. Route 10 Pavement Repairs – Barrigada From Monday, 6/10/24 to Saturday, 6/15/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue pavement repairs along Route 10 starting from Leyang Road to the Route 8/10/16 Tri-Intersection. There will be intermittent lane closures along both sides of traffic. Route 10 Striping – Mangilao The DPW contractor will continue striping Route 10 starting in Mangilao working north towards Barrigada. Work will occur between 7:00 AM and 4:00 PM, weather permitting. There will be intermittent lane closures. Islandwide Grass Cutting Maintenance Project The DPW contractor will be grass cutting at the following locations, weather permitting: - Sunday, 6/9/24 – Monday, 6/10/24: Route 6 & Route 7
- Monday, 6/10/24 – Thursday, 6/13/24: Route 1 Hagåtña – AAFB
- Saturday, 6/15/24 – Sunday, 6/16/24: Route 17
Work will occur between 7:30 AM and 5:00 PM. There will be intermittent lane closures. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews. Islandwide Village Street Paving – Chalan Koda The DPW HMC crew will continue prepping Chalan Koda for paving. Work will occur between 7:00 AM and 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews. Route 28 (Y Sengsong) Roadside Maintenance – Dededo The DPW HMC crew will be performing roadside maintenance on Route 28 (Y Sengsong). Work will occur between 7:00 AM and 3:30 PM. There will be intermittent lane closures and lane shifts. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews. Route 1 Roadside Maintenance – Adelup to Piti The DPW HMC crew will be performing roadside maintenance on Route 1 from Adelup to Piti. Work will occur between 7:00 AM and 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews. |