Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged. Route 5 and Portion of Route 12, Reconstruction and Widening (Route 2A to Naval Magazine/Route 12) – Santa Rita Construction activities will continue along Route 5 from Route 2A to Route 17 with intermittent lane closures. Motorists are advised to slow down while driving through this area. Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr), Phase 1 Cliffside – Tamuning There is a full road closure between Congressman Palting Loop and Pale San Vitores Road for the construction of a new retaining wall and widening of Ypao Road. Motorists will have to take alternate routes. The public is advised not to enter the construction area. Route 14 Resurfacing from Route 1 to Route 14B – Tamuning From Monday, 4/1/24 to Saturday, 4/6/24 between 9:00 AM and 4:00 PM, motorists are advised that there will be lane shifts and intermittent lane closures along the northbound and southbound lanes of Route 14 (Chalan San Antonio) from Route 1 to the Archbishop Felixberto Flores Circle and to the Hilton Hotel on Pale San Vitores Road. Islandwide Guardrail Repair & Replacement, Route 4 from Route 1 to Route 10 From Monday, 4/1/24 to Friday, 4/5/24 between 9:00 AM and 4:00 PM, motorists are advised that there will be lane shifts and intermittent lane closures along Route 4 at Sol Market (Flora Pago Entrance). Islandwide Village Street Pavement Resurfacing – Chalan Emsley, Yigo The DPW contractor will be milling and paving Chalan Deangelo, Cain Markie, and Chalan Untalan in the Chalan Emsley area during the week. Work will occur between 7:00 AM and 4:00 PM. There will be intermittent lane closures. Route 1 Median Painting The DPW HMC crew will resume painting medians along Route 1, starting near the Dededo police station working south towards upper Tumon. Work will occur between 7:00 AM – 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews. Islandwide Grass Cutting Maintenance Project The DPW contractor will be grass cutting at the following locations during the week between 7:30 AM and 5:00 PM, weather permitting: - Monday, 4/1/24 – Wednesday, 4/3/24: Route 3
- Thursday, 4/4/24 – Friday, 4/5/24: Route 16 and Route 8
- Saturday, 4/6/24: Route 10, Route 6, and Route 7
- Sunday, 4/7/24: Route 6, Route 7, and Route 15
There will be intermittent lane closures. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews. |