Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged. Islandwide Primary Roads Paving & Pavement Markings TO-3: Route 8 Pavement Repairs – Barrigada Paving repairs along Route 8 in Barrigada are tentatively scheduled from Monday, June 23 to Friday, June 27, 2025, with confirmed work on Saturday, June 28, 2025. Weekday work hours will be from 9:00 AM to 4:00 PM, while weekend work is scheduled from 7:00 AM to 4:00 PM. The construction will take place between the Route 8/7A intersection and StayWell Insurance through E.T. Calvo Way. Intermittent lane closures are expected in both directions during work hours.
No construction activities are scheduled for Sunday, June 29, 2025. Route 27A Roadside Maintenance – Dededo From Monday, 6/23/25 to Saturday, 6/28/25 from 9:00 AM to 3:00 PM, please be advised the DPW-HMC crew will be bush cutting along Route 27A (Fatima Street) in Dededo. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews. Route 1 Roadside Maintenance – Piti From Monday, 6/23/25 to Saturday, 6/28/25 from 9:00 AM to 3:00 PM, please be advised the DPW-HMC crew will be side cutting Route 1 in Piti. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews. |