Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged. Heavy Haul Cargo Transport for Ukudu Power Plant Motorists are advised to drive with caution as prep work for the transport of heavy haul equipment for the new Ukudu Power Plant continues along Marine Corps Drive. Please plan to take alternate routes to your destination. Traffic signal span wire replacements will occur on the following dates: Subscribe to poweronthemove.org to stay up-to-date and informed on the project. Happy New Year from Doosan Ukudu Power and Doosan Enerbility! Route 28 Rehabilitation from Route 1 to Bumuchachu Street – Dededo From Monday, 1/9/23 – Sunday, 1/15/23 from 8:30 AM to 4:00 PM, motorists are advised that there will be lane shifts and intermittent lane closures along Route 28 (Ysengsong Road) from Buena Vesta Avenue to San Antonio Avenue.
From Monday, 1/9/23 – Sunday, 1/15/23, access to East San Antonio Avenue from Route 28 will be closed to traffic. Motorists will have to take East Santa Barbara Avenue or East Santa Monica Avenue. Signs for alternate routes will be posted. Route 5 and Portion of Route 12, Reconstruction and Widening (Route 2A to Naval Magazine/Route 12) – Santa Rita Construction activities will continue along Route 5 from Route 2A to Juan C. Lizama Street with intermittent lane closures. Motorists are advised to slow down while driving through this area. Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr), Phase 1 Cliffside – Tamuning There is a full road closure between Congressman Palting Loop and Pale San Vitores Road for the construction of a new retaining wall and widening of Ypao Road. Motorists will have to take alternate routes. The full road closure is expected to last until May 2023. Islandwide Guardrail Repair and Replacement – Route 4 between Route 1 and Route 10 Motorists are advised of possible lane closures throughout the week between the hours of 8:30 AM and 4:00 PM Tuesday, 1/10/2023 to Friday, 1/13/2023. Islandwide Village Street Pavement Resurfacing – Dededo The DPW HMC crew will continue preparing Chalan Pujitos for paving and may begin preparing Chalan Kareta for paving if time and weather permits. Work will occur between the hours of 7:00 AM – 3:30 PM. There will be intermittent lane closures. We encourage residents in these areas to exercise caution. |