Traffic reroutes: March 5-11 - KUAM.com-KUAM News: On Air. Online. On Demand.

Traffic reroutes: March 5-11

Posted: Updated:

Bile/Pigua Bridge Replacement (Merizo) 

Motorists are advised that construction activities are ongoing at the Bile and Pigua Bridges. Intermittent traffic stoppages should be expected for up to 5 minutes at both the Bile and Pigua Bridges between 9:00 a.m. and 4:00 p.m. as construction progresses. 
 

Route 1/3 Intersection Improvements (Dededo) 

Motorists are advised that construction activities are ongoing at the Route 1/ Route 3 intersection. The Route 1 northbound left lane west of the intersection will be a left turn-only lane onto Route 3. Two northbound through lanes will be maintained. 

Motorists traveling northbound on Route 1 through the Route 3 intersection are advised to move to the right two lanes in advance of the intersection. 
 

Route 20, (Tiyan Parkway) Structure Demolition 

Motorists are advised that demolition activities are ongoing along Route 20. Motorists are advised to expect construction traffic entering and exiting the construction area. 
 

Guam Economic Development Authority (GEDA) - San Vitores Road Flood Mitigation Project (Installation of additional storm water and trench drain inlets between Fujita Road and Route 14) 

The GEDA contractor will continue inlet construction from the Hyatt Hotel to the Westin Hotel. Lane reductions will occur on the right southbound and northbound lanes of San Vitores Road between 8 a.m. and 5 p.m. 

Motorists are advised to expect delays during these times due to intermittent lane closures. 
 

Route 1 – Hagatna 

The Department of Public Works (DPW) Highway Maintenance crews will continue installing pavement marking and paint the raised median along Route 1 between Pizza Hut and Route 8 Intersection starting from 8:00 a.m. until 5:00 p.m. They will also start installing pavement marking and paint the raised median along Route 1 between Guam DPW and Micronesia Mall starting from 8:00 a.m. until 5:00 p.m. Motorists are advised to expect delays during these times due to intermittent lane closures and shifts. 
 

Lucas Sablan Blvd – Gill Breeze 

The Department of Public Works (DPW) Highway Maintenance crews have completed the road bed preparations for hot mix asphalt paving. Paving to commence shortly. Motorists are advised to proceed with caution through the construction areas and to expect delays. 
 

Santate Lane – Nimitz Hill 

The Department of Public Works (DPW) Highway Maintenance crews have completed the road bed preparations for hot mix asphalt paving. Paving to commence shortly. Motorists are advised to proceed with caution through the construction areas and to expect delays. 
 

Erskin Drive – Agat 

The Department of Public Works (DPW) Highway Maintenance crews have completed the road bed preparations for hot mix asphalt paving. Paving to commence shortly. Motorists are advised to proceed with caution through the construction areas and to expect delays. 
 

Motorists are advised to drive cautiously through all construction zones, observe all posted speed limit and construction signs, and carefully heed to flaggers. Alternative routes and/or adjusting drive times when feasible are encouraged. 
 

 


GUAM TRANSPORTATION PROGRAM 
Telephone (671) 646-3452 
Fax (671) 646-3449 
Email: info@guamtransportationprogram.com 
Website: www.guamtransportationprogram.com
  • NEWS HEADLINESMore>>

  • Guam EPA getting funds beach for water quality monitoring

    Guam EPA getting funds beach for water quality monitoring

    A cut of more than $900,000 is heading our way. US EPA providing the money to Guam EPA, American Samoa EPA, and the Bureau of Environmental and Coastal Quality in the CNMI. The funds would support beach water quality monitoring and information sharing thrMore >>
    A cut of more than $900,000 is heading our way. US EPA providing the money to Guam EPA, American Samoa EPA, and the Bureau of Environmental and Coastal Quality in the CNMI. The funds would support beach water quality monitoring and information sharing thrMore >>
  • Could cockfighting be banned on Guam?

    Could cockfighting be banned on Guam?

    Guam is not in the clear yet on whether cockfighting will be banned here. The House of Representatives passed the Agriculture and Nutrition Act of 2018 or the Farm Bill today. The measure not only makes drastic cuts to SNAP or food stamp benefits but woulMore >>
    Guam is not in the clear yet on whether cockfighting will be banned here. The House of Representatives passed the Agriculture and Nutrition Act of 2018 or the Farm Bill today. The measure not only makes drastic cuts to SNAP or food stamp benefits but woulMore >>
  • Small protest held outside future Marine base in Dededo

    Small protest held outside future Marine base in Dededo

    A small group of protesters led by legislative candidate Ned Pablo held a rally along the site of the future US Marine Corps base in Dededo. Pablo says he opposes the buildup because the Chamorro people were not consulted, and local leaders ignored all thMore >>
    A small group of protesters led by legislative candidate Ned Pablo held a rally along the site of the future US Marine Corps base in Dededo. Pablo says he opposes the buildup because the Chamorro people were not consulted, and local leaders ignored all thMore >>
Powered by Frankly